Copy
From design and construction through warranty and ongoing service, we provide our clients with technical expertise and experience. Visit our website: http://bccomfort.com to learn more.

 Newsletter for May 2016

CONTACT US

If you would like to contact our office, we are located at:
 

7405 Lowland Drive
Burnaby, BC  V5J 5A8

Phone: 604-439-3344

Fax: 604-439-0173
 

Our hours are 8:00 am to 4:30 pm, Monday through Friday.
 

You can also contact us by email:

Sales:
sales@bccomfort.com

Service: service@bccomfort.com

Controls: controls@bccomfort.com

Servers: servers@bccomfort.com

Design-Build: designbuild@bccomfort.com


BC COMFORT GROUP OF COMPANIES

 






 


SEND US FEEDBACK

If you have any questions or feedback regarding our newsletter please send us an email.


We encourage you to provide feedback on 
related topics, articles, or advice you’d like us to write about.

We look forward to hearing from you.


 

 

CONNECT WITH US

Like Us on Facebook
 
Like Us on 

Follow Us on Twitter

Watch Us on 
 

 

 

WHAT'S INSIDE


FEATURE ARTICLE

Preparing for the HCFC Phase Out
  

INFOGRAPHIC

6 Ways to Lower Your Building's Environmental Impact
 

FEATURE PROJECT

'Little India' Commercial Development 
 

BC COMFORT TV


Watch BC Comfort TV where we share valuable video resources on YouTube.



BC COMFORT BLOG


Check out our BC Comfort Blog where we share articles designed to assist you with HVAC, Energy Efficiency, Design Build and Mechanical Systems.

 

CONFIRM YOUR SUBSCRIPTION

 
 

GREEN INITIATIVES

Climate Smart

BC Comfort is actively working with Climate Smart to reduce
carbon emissions.

To learn more, click here.

 

In this month's newsletter, we share some important information on the phase out of HCFCs and how this will affect building owners, along with some ways to lower your building's environmental impact. 

We also ask for your valued feedback on our services. Would you be willing to leave us a review? You can do this easily by clicking here

 


We encourage you to visit our blog and LinkedIn Page for more information on improving energy efficiency along with some of our insights on Sustainable Design and Mechanical Systems. 

If you would like advice for your next building project or to learn more about how we can help you to save energy, please contact us today.
 

Preparing for the HCFC Phase Out 


With rising concern over environmental risks, the Canadian government made a decision  to participate in the phase out of hydrochlorofluorocarbons (HCFC)-22, based on the terms of the Montreal Protocol. 

The implications for the HVACR industry are significant. This article is designed to provide you with a brief overview of the upcoming phase out, including how this affects HVAC equipment service and maintenance.

 


In 1987, developed nations came together to establish the Montreal Protocol, an international treaty designed to phase-out the production and importation of ozone-depleting substances, including harmful chlorofluorocarbons (CFCs).

The agreement allowed for certain ozone depleting substances to continue in use for a limited period of time, including hydrochlorofluorocarbons (HCFCs, e.g. R22 refrigerant gas), which are used in the maintenance or servicing of refrigeration, air conditioning and heat pump equipment.*

In Canada, more than 95% of commercial and residential air conditioning units and more than 50% of commercial refrigeration equipment operate on HCFC refrigerants (primarily R-22).

Canada and other developed nations are now moving forward with regulatory plans to eliminate the use of HCFCs and dispose of the surplus inventories that remain in use.

By 2020, the annual allowable amount of HCFCs will be reduced by 99.5% except HCFC-123 which can be imported or manufactured until 2030 to service large air conditioning units (chillers) under the remaining .5% allowance. No new HCFC equipment is to be manufactured or imported into Canada.*

 


There are a variety of options available to replace both HCFC refrigerants and equipment or systems. Building and equipment owners need to understand the impact of the HCFC phase out and consider two options:

1) To retrofit their existing HCFC equipment and use an acceptable alternative refrigerant instead of R- 22. Retrofitting is typically the less costly option.

2) The second option is to replace existing HCFC equipment. While this option is more costly upfront, building owners will get the most energy efficient air conditioning system with the lowest lifetime costs.

Some of the replacement options for HCFCs include hydrofluorocarbons (HFCs), although this may only be a short term solution. An ammonia system, is another option for large commercial air conditioning systems. Both options require the replacement of equipment. Talks over replacement options are ongoing and reductions may start in 2018.


For more information on HCFC alternatives and the HCFC phase out schedule, click here.

Any operator of equipment running on R22 should consider the impact of this ban and ask for advice from a qualified service contractor to ensure that any business-critical equipment is retrofitted with an alternative or replaced before 2020.
 
 


The first step is for commercial and industrial owners to invest time in reviewing their current equipment, taking into account the lifespan, and whether or not the equipment can continue to be maintained after 2020.


Next, they should discuss with a service contractor or equipment specifier both short and long term plans for their equipment needs.


BC Comfort is committed to assisting owners in making the right decision about whether to replace or retrofit equipment. For more information, contact our Service team today.

*Article Source:
http://www.hrai.ca/PDFs/HRAI_BrochureWebSite.pdf  

 






















 




Feature Project


'Little India' Commercial Development - Surrey 

Address:
 8028 128th St., Surrey, B.C.

Project Information: 100,000 SF Retail and Office

Completion Date: May 2016

Project Type: Design-Build

Mechanical Consultant: BC Comfort

General Contractor: Wales McLelland Construction

Mechanical System Description: Roof Top Units and Split Systems
 





 

Don't Forget to Confirm Your Subscription 


At BC Comfort, it's our commitment to provide you with valuable advice and industry insights through our monthly newsletter. 

In order for us to comply with the new legislation, we need to know if you would like to continue receiving email communications from us. 

Please make sure that you have reconfirmed your email subscription by clicking on the envelope below (please note you will need to click the
Update Profile button).

If you have any questions, please contact us at support@bccomfort.com
 

We’d Like to Hear From You


If you have any questions or you would like to provide feedback regarding our newsletter, including suggested topics or articles you’d like us to write, please send us an email.


Follow on Twitter | Like on Facebook | Watch on YouTube | Submit Review on Google | Forward to Friend  share on Twitter Google Plus One Button
Copyright © 2016 BC Comfort Air Conditioning Limited, All rights reserved.
unsubscribe from this list | update subscription preferences