Copy
View this email in your browser

  

Overwhelming
Public Response


 

  • 1000 Citizens, Community Leaders and Elected Officials Attend 3 Days of Public Hearings;
     
  • Present 23 hours of Personal Testimony;
     
  • 1000+  Online Comments Received - 98% Opposing
     
  • 30 Individual Citizen and Municipal Intervenors;
     
  • 12 Environmental/Consumer Group Intervenors
     
  •  3,345 documents / 21 Opposing Briefs Filed

     

One of two Public Hearings in Dodgeville - June 27
Photo - DRIFTLESS DEFENDERS
          

Consumer Advocates Say Transmission Line Not Needed, Benefits In Doubt



       Wisconsin State Journal July 14, 2019 Reporter, Chris Hubbuch July  

        "Wisconsin’s utility customer advocacy group has joined landowners, local governments and environmental groups urging Wisconsin regulators to reject a proposed high-voltage power line project, which they call outdated technology.
     
         In a legal brief filed Friday, the Citizens Utility Board said there’s no evidence the $500 million line, known as Cardinal-Hickory Creek, is needed for reliability and it may not deliver the benefits its owners promise. Opponents argue the line is an old approach to generate profits for its owners. They say there has been inadequate study of newer and cheaper alternatives, such as in-state solar and battery storage. “This Commission has to save the utilities from their penchant for living in the past,” wrote SOUL, one of more than a dozen groups fighting the project. .  .

        “[The Regional Utilities project] may make sense as a portfolio but time has passed this project by, given advances in technology that have brought down the cost of solar and storage,” said Tom Content, executive director of CUB. “
 
        Dane County, which opposes the line, argues the applicants failed to demonstrate a need and overstated certain impacts. The county points to a finding by commission staff that Wisconsin ratepayers would be better off if the project were delayed two years. “Applicants cannot possibly demonstrate that there is justification for this Project, when Commission staff have shown that a delay of two-years will only serve to bolster Wisconsin transmission customers,” wrote Carlos Pabellon, the county’s deputy corporation counsel. '

        The Driftless Area Land Conservancy and Wisconsin Wildlife Federation have been some of the fiercest opponents of the line, which they liken to land lines and telephone poles in an era of wireless technology. They say Wisconsin ratepayers would be better served by investments in local renewable generation and storage and improving existing transmission lines. “The proposed CHC transmission line is a 1990s approach,” the groups wrote in their brief. “The Applicants may be stuck in their highly-profitable past of huge capital investments, but, on behalf of the Wisconsin public and consumers, the PSC must not be.”

 

 

   

Excerpts From 
Opposing Parties Initial Briefs
 FROM PSCW  DOCKET 05-CE-146 
 

Kerry Beheler           Citizen Intervenor              Mount Horeb, WI

Gloria & LeRoy Belken     Citizen Intervenors                Montfort, WI

Jim Campbell           Citizen Intervenor                         Rewey, WI

Citizens Utility Board of Wisconsin                          Intervenor

Driftless Area Land Conservancy
Wisconsin Wildlife Federation
                                 Joint Intervenors

Dane County                                                                  Intervenor
 
Mike Dubis                           Citizen Intervenor    Cross Plains, WI

Linda Grice                          Public Intervenor     South English, IA

Alan Jewell / Richard Jinkins     Public Intervenors    Cobb, WI

Chris and Louise Klopp               Intervenors    Cross Plains, WI

Joel Kurth                               Citizen Intervenor      Waunakee, WI

George Schwarzmann                   Public Intervenor    Belmont, WI

Joe Schwarzmann                              Public Intervenor    Stitzer, WI

Eli Stoltzfus Old Order Amish         Public Intervenor,     Belmont, WI

Village of Montfort                        Municipal Intervenor  Montfort, WI 

Lila Zastrow/Dave Hendrickson              Intervenors,   Seymour, WI 


 
 

ANCHOR
 

SOUL of WISCONSIN
Initial Brief

 

BEFORE THE
PUBLIC SERVICE COMMISSION OF WISCONSIN 

Cardinal Hickory Creek Docket 5 CE-146
 

Introduction


The Commission should focus on the common goal of maintaining solvency of Wisconsin Utilities while providing affordable, reliable power and cost-effective C02 reduction.

        Wisconsin State Sen. Howard Marklein suggested the following to PSC Chairman, Lon Roberts about the CHC Project,

Throughout the last three years, I have studied the proposed powerline project, met with stakeholders and listened to dozens of concerned constituents.... I share the main concern among my constituents. We want to know whether this powerline project is necessary... I am also concerned about the financial implications of this project. I do not want the residents of our communities to suffer an unfair financial burden on our utility bills as a result of this project. Please consider this concern during your analysis.” 1


         Sen. Jon Erpenbach wrote to Roberts with three other lawmakers:

With the rapid expansion of high-voltage transmission HVT facilities throughout Wisconsin over the past 10 years, they have had substantial impacts on rates and fixed fee increases.” 2
 

        Among the eight, total lawmakers, Representatives Nowak and Tranel wrote,

Again, we are asking that the PSC considered the cost benefit ratio of the Cardinal Hickory Creek transmission line proposal, If it is determined that more capacity is needed, we would request that alternatives which improve service without such a large capital investment be strongly considered. Homeowners and small businesses can't afford increases and electrical rates are small businesses in Southwest Wisconsin need to remain competitive and higher electrical bills are a tremendous liability.”
 

        In February of 2018, in its invitation to the Inter-Municipal Energy Planning Committee to participate in the WI PSC’s Grid Modernization inquiry, Commission staff posed the question: “What regulatory difficulties does IMEPC foresee in reaching its Grid Modernization goal?”3 The Committee of nine municipalities responded with interest in a Town of Arena / WP&L collaboration to accelerate lower-cost distributed energy resources and thereby avoid capital spending. 4
 

        In August, 2018, in a section titled, “Rate Metrics and Cost Drivers,” the PSCW’s 2024 Strategic Energy Assessment described “authorized revenue requirements,” of Investor-Owned Utilities with Generation and Non-Major Investor-Owned Utilities and Municipal Utilities, disclosing rate pressure imposed by continuing growth in revenue requirement components. This is the context in which Applicants continue to pressure for continuing capital utility investment providing services with increasingly lower value. In this case, perhaps more than any before, ratepayers seek help from the Commission to slow and reverse this unproductive trend.
 

        Applicants are focusing on their specialities and ignoring the pressure on rates. Their No Action5, base case includes approximately $200-$270 billion in new power plant related costs.
 

        Applicant witness, Tom Dagenais criticizes, SOUL witness Bill Power’s Optimized NTA for IMEPC member Town of Vermont for supposedly assuming that, “area utilities will be able to maintain solvency on a long-term basis with minimal rate increases while serving little to no area load and while paying retail electric rates to individual ratepayers who will be overproducing energy, make little sense.”6 This Commission has to save the utilities from their penchant for living in the past. As SOUL Witness Bill Powers’ stated:
 

Witness Dagenais underscores a critical point with this statement. A status quo utility business model, which he presumes is immutable, is not a good fit for a clean, distributed energy future of which the Optimized NTA presented in my direct testimony is an example. For this reason, utility models around the country are evolving to anticipate a future with many distributed energy resources supplying the grid, and utility earning revenue by coordinating the flow of this distributed energy resources (DERs) – not by serving load in the traditional “volumetric supply” manner presumed by Witness Dagenais.” .7

         As “solvency” is the ability of all parties-- private companies, the state, municipalities and individuals -- to meet their, long-term, debts and financial obligations, this proceeding has signaled that all parties will have to work together and realize monetarily responsible energy planning8. If the Commission wants to curb the, “construction cycle” and high increases in required annual revenue, all of these parties must be prepared to conduct energy planning based on collectively fewer dollars spent.



Analysis

Applicants Ignore Important Costs

         The FEIS cites studies suggest mathematical formulas to help estimate impacts of 345 kV transmission on property values, future business and housing development and tourism. Unlike the carefully generated estimates concerning costs for and potential benefits from the 345 kV project, the FEIS does not take the next logical step of estimating the land-based economic impacts. By applying suggested formulas to three examinations conducted by public intervenors of municipal property value devaluations through sales transactions over time, the highly significant monetary repercussions from the 345 kV transmission line can be sensed in Table 1:
 

TABLE 1: Rough estimate of property devaluations in Project study area based on local estimates submitted to the docket by three potentially affected municipalities9.


click to enlarge

        If the EIS’s cited more conservative 10%10 devaluation percentage is applied to only directed impacted properties, the roughly estimated loss across the study area would be around $70 million. These devaluations would eventually affect tax revenue, levying and mill rates, They do not account for lost development housing and businesses not constructed in the view-scape or even larger impacts on tourism. 38-39% of DEIS comments expressed concern about losses in property value, business and tourism.11

         Cumulatively, without assigning monetary values to the adverse impacts on natural systems, agriculture, grazing, forestry and recreation, the Commission would be wholly justified in adding $100-$120 million to the Project cost of $67 million creating a comprehensive cost of about $180 million when budgeting alternatives for comparisons of net benefits.

 


The Benefits of Alternatives Should Have Been Addressed from the Outset.

          This proceeding also brought to attention of the public that the software tools used for calculating long-term, potential energy cost savings are typically not configured to fully account for the monetary impacts of Non-Transmission Alternatives. They exclude the economic benefits of avoided energy use. Had PSC engineering staff initiated a PSC Non-Transmission Alternative before the application saddled staff with non-stop PROMOD reviews, staff might have noticed this flaw and asked the applicants to address the issue in their first set of data requests. As shown below, including savings from avoided energy use would have elevated the consideration of Non-Transmission Alternatives. Because Applicants omitted customer energy savings – a factor of high importance to the ratepayers this Commission is directed to protect-- and because staff was saddled with massive tasks in a very limited time frame, this critically important information did not become part of the proceeding until April 26, 2019, when intervenor testimony was submitted.


 

A decision to upgrade existing infrastructure and encourage end-user improvements better serves the purposes of the Commission and the state.

       
          The asserted purposes of ATC’s “strategic flexibility” and MISO’s “reasonable bookends” methodologies is to establish a range of claimed “plausible” future scenarios.
12 MISO portrays it thus:

 

Figure 1 : MISO’s Figure labeled, “Robust Figures Capture Reasonable Bookends. 13
 

           “Reasonable bookends” for the Commission must be defined differently from how MISO – an entity that is now creating broad ranges of hypothetical growth to hide unnecessary unnecessary investments– defines them. The “bookends” for the PSC are defined by ratepayers’ interests, preferred energy strategies as established by the legislature, and the factors indicated in the CPCN law. Effective decision-making requires sufficiently detailed options that advance these interests. The Applicants’ plausibilities are big on money and small on solutions.

           When committing ratepayers’ wallets it is conservative to develop, and to choose, an option for which benefits can be expected with a great degree of confidence. That option here – which Applicants sought to obscure – would combine an NTA with acceleration of already-planned upgrades to existing infrastructure.

          When energy use is more or less flat, “flexibility” means doing what you know will work. This means taking paths to reliably produce benefits soon not those that might produce benefits later on. MISO planners seem incapable of grasping this.

          The Applicants’ software assumptions and preferences masked over the economic advantages of rebuilding and uprating transmission facilities approaching the end of their expected life. Overwhelmingly persuasive, and largely unchallenged, testimony discloses how fast evolving NTA options are aligning with Wisconsin’s priorities to produce superior values for Wisconsin ratepayers.
 

Desired Transmission System Capabilities Can Be Enhanced At Much Lower Cost By Implementing The PSC Staff’s “Base With Asset Renewal Alternative and Grid Modernization” Option And Similar, Already-Contemplated, Grid Improvements.


         A very significant percentage of Wisconsin’s transmission system was built between 1950 and 1980. 14 The wooden poles making up much of this system have a lifespan of about 70 years. ATC expects to re-build nearly one-quarter of its lower voltage lines (2,000 miles) over the next 20 years15. PSC staff have determined that rebuilding, when appropriate, can double the power transfer capabilities of these lines.

 

         PSC Staff’s Base with Asset Renewal Alternative (BWARA) would make three rebuilds or “uprates” already scheduled by 2030:

Base with Asset Renewal Alternative (BWARA) Cost $897,474

 

  • 2.6 mile Turkey River – Stoneman 161 kV crossing the Mississippi River at Cassville;

  • 2.5 mile Stoneman - Nelson Dewey 161 kV from S. Cassville to N. Cassville;

  • Townline Road - Bass Creek 138 kV16

 

          Staff observes that making these upgrades

. . . would alleviate the major constraints on the existing transmission system in southwestern Wisconsin, and that the proposed Cardinal-Hickory Creek project provides a gross avoided reliability benefit of $897,474, when using the NERC Transmission Planning Criteria stipulated in NERC TPL-001-4.” 17
 

          PSC Modeling that included the impacts of two, recently approved, in-state, solar installations in SE and SW Wisconsin showed improved generation balances and grid flows:

.. . . incorporation of the Commission-approved Badger Hollow and Two Creeks solar facilities greatly reduced flows across existing constrained transmission system elements in Wisconsin in the absence of the proposed Cardinal-Hickory Creek project.”18

          Similarly,

For [the] Base with asset renewal” alternative, overall, flows are much lower [less congested] than any other alternatives because of the upgraded MVA ratings of some of the transmission lines.” 19
 

        Staff cannot promote improvements beyond the current docket but four additional low voltage lines (marked ^) in South and South-Central Wisconsin have been essentially identified as sequential system rebuilds/uprates and the Applicants have identified additional low voltage transmission lines they consider old enough to be upgraded along with CHC:
 

  • ^ Portage B2-Columbia 138 kV

  • ^ Columbia-Portage 138 kV

  • ^ West Middleton-Timberlane Tap 69 kV (Middleton,                 #6927)

  • ^ Timberlane Tap-Stagecoach 69 kV (Cross Plans area)

  • Nelson Dewey – Eden 138 kV (Cassville – Montfort, X-16)

  • Nelson Dewey – Hillman 138 kV (Cassville- Platteville,              X-15)

  • Hillman – Falcon 138 kV (Platteville- E. Platteville, X-14)

  • Eden – Hillman 69 kV (Montfort- Platteville, Y-106)

  • Eden – Dodgeville 69 kV (Montfort- Platteville, Y-138)

  • Eden – Spring Green 138 kV (Montfort- Spring Green,                X-17)

  • Wally – Stagecoach 69 kV (Mount Horeb – Cross Plains,          X-128


        By combining these lists, decision-makers can ascertain that about one dozen older transmission lines in the Project study area will require rebuilding that will greatly increase their power transfer abilities in the near future. From a reliability perspective, these sequential projects, many serving population centers, comprise most of what Applicants characterized as a chronically20 challenged system that they claim requires the 345 kV Project they want the PSC to order the ratepayers to pay for.

 

Grid Modernization and Non-Transmission Alternatives As Proposed By SOUL Work In Concert To Serve The Purposes The Commission and the whole State
 

          Neither PSC staff nor Applicants have analyzed the cumulative effect of these pending improvements. Further, they have not yet started the exciting and community-engaging processes of Grid Modernization incorporating use of Distributed Energy Resources (DERS), such the use of solar and battery storage support at locations that can extend the lifespan of transformers and other expensive components. As SOUL witness Bill Powers points out, this is already happening in Wisconsin. In addition to municipal projects now underway by UMMEG, Applicant Dairyland Power Cooperative has added about twelve collaborative, community solar farms near aging transmission line substations to prolong the lifespan of expensive transformers and other expensive components.21 As Applicants’ own witness, Dr. Chao, confirmed,22 the trend in such development is to fund the NTA either entirely locally, through third party commercial developers or through collaboration of member-customers and commercial interests as Dairyland has done. This model is highly advantageous. It allows utilities to participate, if desired; it encourages state-located DER services to grow; it enables served businesses and households who want to “go solar” but can’t site it; finally it avoids avoid conscripting ratepayers to expansive capital expenses.

           NTAs emphasize efficiency and distributed renewable resources. They are designed and sited to reduce use of grid power that still averages only 9% renewable energy (8% wind and 1% hydro).23 NTA’s maximize CO2 reductions by avoiding use of carbon-laden grid power while providing end users with energy savings, load management abilities and, increasingly, resiliency through personal and shared solar + storage.

          Utilities will and should ask for more sharing of incentives to enter these collaborations but, unlike high capacity transmission expansion, there is strong evidence of electric customer and municipal/county government engagement with this direction.
 


click to enlarge

     
         Comment tabulators Laurie Graney, Lila Zastrow and David Hendrickson agreed upon the total count of 503 online comments. These do not include testimony made in-person, submitted in writing at the public hearings or mailed in.

         Considering that online commenters are more prone to open the comment window and start typing what is on their mind, the number of mentions of “NTA’s” and “BWARA” indicate significant interest in alternatives. BWARA was unknown to the public 60 days before the public hearings. Though not tracked, tabulators noticed a considerable number of commenters reside outside of the study area and there were a significant from out of state electric customers.



The NTA’s Presented By SOUL Witness Powers Illustrate How The Commission Should Move Forward Now.

       
         NTA's commonly expand rebate amounts and offerings in state energy efficiency programs. Mr. Powers’ NTA proposal for SOUL incorporated utility-offered load management and existing and new Focus on Energy rebates,
24 and added Focus rebates for community solar and aggregated “PowerWall” style residential battery storage.25 In modeling numerous villages and smaller cities in Southwestern and South-Central Wisconsin where transmission and distribution facilities will be remodeled in coming years26, Powers also included municipal-scaled solar facilities with battery storage based on a successful PPA collaboration between Dannon Yogurt, Wisconsin-based Half Moon Ventures and the Minster (Ohio) Municipal Utility. 27

 

TABLE 3: Components of Bill Powers’ $66 Million Optimized Non-Transmission Alternative


click to enlarge

 

TABLE 4: Components of Bill Powers’ $177 Million Optimized Non-Transmission Alternative


click to enlarge

 

          Non-Transmission Alternatives relying on distributed, end user solutions including load management, energy efficiency, solar and storage produce benefit to cost ratios in excess of 20:1. This is because their main product, avoided energy use, is realized at retail instead of wholesale rates. This is a profound economic driver in states that have made the shift.
 

TABLE 5: Comparison of Economic Benefits and CO2 Reduction Capabilities of key Alternatives before the Commission28:


click to enlarge

 

Emerging Practices Are Superior To The Project.


          Economic and CO2 reduction benefits of NTAs increase when they are sited and designed to remove load from constrained transmission facilities. Already-identified opportunities for sthis targeting exist at substations near Cassville, Mount Horeb, Cross Plains, and Platteville. Contrary to Applicants’ contentions, these solutions increase grid flow or “transfer” comprehensively.

           The Applicants, instead, convert existing infrastructure into “stranded assets.29” Then, they appropriate them as benefits. NTA’s do the opposite; they reduce strain on aging transformers and 1950-1970 era conductors extending their useful life span while creating savings that communities and utilities use to replace transformers and wires when the time comes.

           When SOUL witness Power’s NTA 2 alternative is combined with uprated transmission facilities, the PSC-staff designed “BWARA,” the advantages of such right-sizing become very apparent. Comparable strategies are advancing quickly in other states because coordinated supply and demand side investments save money and make fastest gain on reducing CO2 emissions. The approach of MISO and the Applicants is increasingly out-of-sync with these important trends.

 

Analysis of the Applicants’ Proposal

 

MISO offered little or no, up to date quantitative evidence that the Project is a fully qualifying MVP candidate.MISO offered little or no, up to date quantitative evidence that the Project is a fully qualifying MVP candidate.

 

  • In its history, MISO has only produced a single portfolio of transmission lines and it was based on cost-sharing. 30
     
  •  MISO witness, Mathew Ellis, a generation specialist, played a key role in the authoring the 2014 Triennial Review of the MVP portfolio. In cross examination he could not recall a MISO state informing MISO that is was falling behind in RPS attainment.31
     
  •  Mr. Ellis oversaw development of the MTEP17 future scenarios that CHC Applicants used as the basis PROMOD
    economic modeling in this case.
    32

     
  •   PSC staff pointed out that all MVP lines except CHC have been built or are under construction. Mr. Ellis did not provide evidence in his testimony of the MVP additions having created the effects MISO forecasted.33
     
  • End use customers or other who are not somehow paid for their participation have not been consulted in the development of MISO planning.34 MISO has never done outreach to end use customers.35
     
  •  Mr. Ellis now holds the titled position of Manager of Economic Studies.36 During cross he did not not know if wholesale prices in MISO have increased or decreased since the advent of MISO. 37
     
  • Witness Mr. Dagenais, for the Applicants, confirmed that the Demand Side assumptions adopted by Applicants for economic evaluation of the CHC do not include “High Cost Energy Efficiency,” but only “Low Cost Energy Efficiency,” residential, commercial and industrial end use customers. The chart that he examined shows that this applied to all residential end use customers.38


 

The Applicants have not demonstrated that the CHC project would provide Wisconsin ratepayers significant, net monetary benefits.
 

           For ratepayers, the only tangibility of CHC economics is future impacts on monthly electric bills. As confirmed by witness for the Applicants, Mr. Degenhardt, very few ratepayers are able to interpret, “net present value,” dependent calculations that Applicants have used in this case to portray pressure to demand or avoid future rate increases.39 As is obvious, ratepayers don’t pay wholesale prices. The “customers” that Applicants and MISO reference are not ratepayers, but LDCs.


           Ratepayers and their governmental representatives are interested in what the facility is going to cost them and what benefits they can reasonably expect. As filed on July 24, 2017, Dane County included this language in their resolution concerning CHC:
 

           “The dollar amount applied to each of these non-transmission investment options, alone and in optimized combination, should equal the estimated total amount ratepayers would assume for the comprehensive costs of the proposed high-voltage transmission project over 40 years, including construction, financing, operation and maintenance. This analysis should include clear, easy to understand charts comparing the monetary and CO2 emission impacts for the non-transmission alternatives and transmission alternatives on average monthly electric bills for Wisconsin residential and commercial customers calculated in present dollars/tons and for year 10, 20, 30 and 40, subsequently.”40

           
            Similar requests seeking impacts on electric bills are in many of the 29 resolutions on file. The Applicants did not provide the requested information.

 

           To address the absence of this information in Application materials, SOUL Witness Bill Powers’ estimated the impacts of CHC on Wisconsin monthly electric bills based on the Applicants41 provided net monetary impacts. He distributed the 40 year totals volumetrically, on average by user class in Table 2, which is reproduced here:42



click to enlarge

           These estimates are the best indicator of the potential impacts of the monetized net benefits of the Project on Wisconsin monthly electric. Though Applicants tried to confound the issue, they nowhere indicate any salient difference between the methodology used by Mr. Powers and the methodology used by ATC ten years ago43.

          Applicants have not disputed that transmission service costs are ultimately distributed to end users on the basis of volumetric use. As a key goal of rate design is to align costs with benefits, no other basis is plausible. The Applicants did not demonstrate there are meaningful changes in from calculating value of money annual rate recovery differences. Most importantly, Applicants provide no alternative estimates of impacts on Wisconsin electric bills which are, best, a few cents per month for residential electric customers. These potential pennies per month do not include $200-$270 billion in capital expansion costs Applicants hide in the ‘No Action” base case

          Applicants provide no ratepayer-level analysis because it would only show how much the risky benefits are not worth the known harms and costs.


 

The Applicants have not demonstrated that the Project is needed for further utility scale RE development in SW Wisconsin
 

          There has been no discussion in this proceeding that any part of Wisconsin is experiencing or is expected to experience in adequate supply of power. Under these circumstances, the addition any utility-scale generation will increase pressure on rates.

          Wind turbines have and always will be controversial additions to any landscape. Solar arrays larger than 20-30 acres dominate landscapes and discourage nearby housing development. Over time, large facilities induce use of more acreage for energy infrastructure which will always be perceived as imposing on the natural setting.

          Assuming that CO2 emissions reductions are the underlying societal goal, a more balanced approach in the long run is making conservation and efficiency a household’s or communty’s top energy priorities. Where appropriate, the utilization of on-site and community solar located “behind meter” greatly increases the CO2 reduction per square solar foot by minimizing use of centrally-supplied power containing fossil fuel generation. In conjunction with waste not ,want not, priorities, on site, behind the meter solar + storage may be providing society our most effective C02 reduction tools for decades. This is born out in states adopting new rate structures in order to create two-way benefits and adequately protect utility solvency.

          Were it not for PSC staff modeling in this docket, very little would be known about the Project’s potential impact on development of new utility scale development in SW WI. MISO/Applicant software includes unbuilt MVP lines in modeling for the Project and interconnection studies. The end result is Applicants did not evaluate or share analysis of the existing system in SW WI nor what would happen if the many, older, existing 138 kV and 69 kV facilities were uprated. Thus, arguments suggesting that new generation in SW WI requires CHC is unfounded. Any intuitions must consider BWARA and affects of other all pending uprates.

          In their analysis of the Low Voltage Transmission Alternative(LVA) Applicants wrote that it “performed comparably to the Project,” It is significant that the LVA is based on a new 138 kV line from Cassville to Middleton
44 The referenced energy cost savings for the LVA have a 1% advantage over those of the Project and change only 5% after the “Eden Outlet Constraint is addressed in modeling. This suggests modeling uprating/doubling the capacity of the existing 138 kV wires going east out of Montfort would have very interesting implications.

          There are strong indications the power plant development in the Montfort/Cobb area stem, primarily, from lower interconnection costs. Whether CHC is approved or not, there is limited proximate siting. Interconnection costs for more plants would increase with every additional mile from area substation. Another reason that RE development in SW WI may be near peak is unknowns about the continuation of federal and tax payer incentives for utility-scale spending.


          As PSC staff have been compelled to explain many times, modeling power from Badger Hollow at the proposed 345 kV CHC Hill Valley substation caused energy cost savings for CHC to decline 66% in the PR case and 77% in the AAT case. 45 How much “benefit” detriment to the Project would introducing more power at Hill-Valley add? No one knows because case records are silent. The use of comprehensive settings in energy planning software without pre-loaded billions in utility expansion and focusing on existing transmission line renewals with Non-Transmission Alternatives has been attempted. SOUL thinks now is the time.

 

Conclusion


         The law requires the Commission to disallow the Project.

          The law deems “supply” to be a potential “alternative” to transmission. Other “locations or routes” are also deemed alternatives. The law requires the Commission to consider these alternatives against the proposal in light of “individual hardships, engineering, economic, safety, reliability and environmental factors.” The Commission can approve the proposal “only” if it finds, in light of these factors, that the proposal is both needed, and superior to the alternatives as a means to advance the public interest. Wis. Stat. § 196.491(3)(d)3.


         Customer and community-based generation, efficiency improvements and storage are “alternative sources of supply.” These sources are available now. Without dispute, these alternatives are rapidly evolving. They are also increasingly being combined together with targeted (and limited) infrastructure investment to avoid larger, costs – notably transmission and substation costs.

         An energy strategy focused on customer- and LDC- side supply, efficiency and storage investments costs less and provides more than the Project. Some incentives for these investments are already “baked into” existing policies, e.g., tax incentive policies. Other incentives can be readily expanded through already existing programs, e.g., Focus on Energy. The strategy leverages other resources that cost ratepayers, as a group, nothing: customer side contributions to the associated hardware such as distributed solar and batteries are entirely “off the books” of the utility system. LDC-based strategies designed to extend the life of conductors and substations deliver benefits in excess of costs.

         These resources on the “other” side of the transmission system are available to the Commission to harness. The compelling cost trends and incentives associated with them mean that they will, increasingly, have to be managed anyway, irrespective of whether the Project is built. The Commission’s opportunity here is to decide to forego the Project and optimize these resources in the interests of ratepayers. SOUL witness Powers described, without rebuttal, how innovative regulators and communities are doing so now.

         Superior “locations and routes” are also available. Wis. Stat. § 196.491(3)(d)3. The Commission need only advance already-planned transmission upgrades, as disclosed by the PSC staff analysis that this brief has labeled “BWARA”. BWARA costs only 1.3% as much as the Project.

         The superiority of any rationally-designed NTA combined with BWARA is obvious.

         Economically, it is no contest. Wis. Stat. § 196.491(3)(d)3. An alternative constituted of these components costs less, or, if the Commission were to “go deep” on the NTA, might cost the same while providing much, much more. It strengthens already-existing infrastructure and leverages customer- and community- side investment in supply, efficiency and storage to substitute for adding another transmission line to ratepayers’ system charges.

         On safety, it is no contest. Wis. Stat. § 196.491(3)(d)3. Upgrading existing infrastructure avoids adding new transmission, which means fewer wires and thus fewer safety hazards. Upgrading existing infrastructure through BWARA means newer wires and fewer safety hazards.

         On reliability, it is no contest. Wis. Stat. § 196.491(3)(d)3. The Project is not needed for reliability and its reliability benefits are incidental. Moreover, much of the claimed reliability benefits derives from the Applicants appropriating for the Project the benefits of the already-planned BWARA upgrades that cost 1.3% less than the Project. Combining BWARA with customer- and community- side supply, efficiency and storage brings superior reliability by substituting new infrastructure for old and adding resilience that comes from improving efficiency and adding distributed generation and storage, a combination that lowers requirements on the Transmission system. This feature led former FERC Chair Wellinghof to opine that a well-designed NTA could provide benefits comparable to a transmission Project, and, merit the same cost-sharing benefit as the Project.

         On environmental factors, it is no contest. Wis. Stat. § 196.491(3)(d)3. Neither wildlife refuges nor associated flyways nor any other land is subjected to the blight and hazards of by new transmission lines.

         Finally, on individual hardships, it is no contest. Wis. Stat. § 196.491(3)(d)3. The Commission has heard the perspective of individuals whose lands, communities and resources will be permanently scarred by the Project. A combination of BWARA with a well-designed NTA subjects no new landowners, communities or corridors to new transmission. Landowners who already have transmission infrastructure on their property obtain the benefit of newer and safer facilities.

         The combination is also more compatible with every element of the energy priorities law, Wis. Stat. § 1.12. Respecting supply, the NTA component focuses entirely on facilitating the highest priority resources, improved efficiency and no-combustion renewable energy. On transmission siting, it not only uses existing corridors, upgrading transmission instead of building new transmission lines.

         
There is only one reasonable decision, and it is obvious.

 

Respectfully submitted on July12, 2019.

S.O.U.L of Wisconsin, Inc.

NOTES
Documents on PSCW Docket

 

1Ex.-CK-Klopp-18-15

2Id.-10

3Ex.-SOUL-Powers-38-2

4Id. . starting at pdf p. 7 “Time to Curb Capital Utility Spending: ...After steadily ramping up investment in new distribution and transmission since 20008 (with parallel rate and fee hikes even as wholesale energy cost dropped), [ALLIANT-WPL] now projects capital investments averaging around $177 million per year in distribution-related investments going forward... In other states, sheer economics are redirecting regulators to develop incentives to encourage utilities to support locally-serving, end user improvements...In its 2013 Distribution study, ALLIANT-WPL tentatively earmarked $57.4 million for distribution substation rebuilds and component replacements in WPL’s South Region12. One of these projects targets potentially replacing transformers worth $1 million in a 69 kV substation located 1 mile from Arena Town Hall, squarely within IMEPC member, Town of Arena’s, jurisdiction. The potential expense is scheduled for 2022 and premised on addressable overload (2.5-7.5 MW14), should load grow in the serviced area. Even with a .5% per year increase in peak demand, however, accelerated energy efficiency, load management, and solar development are Grid Modernization solutions that can address such projected load growth: [suggested were:] *Collaborative Utility/Community/Private Developer Solar Farm: Located near the Arena substation, such a solar farm would remove Arena area load from the substation, thereby lowering demand on the transformers and facilitating more economic power transfer to downstream users. As shown in Figure 518, the location presents possible sites for as much as 7 MW of solar capacity within a half mile of the substation; *Accelerated Energy Efficiency/Conservation; and, Load Management,”

5Ex-PSC-Grant-1 at p. 36

6Rebuttal-Applicants-Dagenais at p.55

7Surrebuttal-SOUL-Powers 5

8Ex.-JDS-Stanfield-5r-14, Principles of Grid Modernization drawn-up by Minnesota emphasize cooperation: “• Maintain and enhance the safety, security, reliability, and resilience of the electricity grid, at fair and reasonable costs, consistent with the state’s energy policies; • Enable greater customer engagement, empowerment, and options for energy services; Move toward the creation of efficient, cost-effective, accessible grid platforms for new products, new services, and opportunities for adoption of new distributed technologies;..”

9Ex.-Klopp- 8 at p.3 for Town of Cross Plains; Ex.-JDS-Stanfield-1r at p.6 for Town of Vermont; Ex.-VOM-Kielisch-2 at p. 42 for Village on Montfort. Cardinal-Hickory Creek Transmission Impact Fees from, Appendix L, Tables 1 and 2, Impact Fee Distribution Preferred and Alternate Routes, PSC REF#341393. For consistency in this table, total 2018 assessed values have been multiplied by the same percentages for the two towns. For the village, the lower percentage of 15% suggested by expert witness Kurt Kielsch for view-scape impacts was con
sistently applied to all potentially affected properties proximate to the proposed Hill-Valley substation.

10FEIS at p. 164

11FEIS at p.10, Table 1-6.

12Ex.-SOUL-Powers-13 at pdf p.8

13Id. at pdf p.9

14Ex.-PSC-Rohankar-3 at p.20

15Id. at p. 21

16Location and size is not yet known. SOUL has not been able to find it in the fine print of the 2010 WI transmission map with named substations.

17Direct-PSC-Vedvik-37

18Direct-PSC-Vedvik-37

19Direct-PSC-Rohankar-12

20Attachment 4.12-1, Alternatives Evaluation Study (2016), footnote 12 at p. 27 reads, “The Lore-Turkey River-Stoneman- Nelson Dewey 161 kV path has been a historical constraint in many types of analysis since before MISO and the MISO market existed. Lore – Turkey River – Stoneman was rebuilt / uprated in the past couple of years so the constraint moved to the next element.” But excessive constraints on the facility date to 1998. See Table 4.1 on p. 77 (pdf p. 93) in the 1998 Report the Wisconsin Legislature on the Regional Electric Transmission System, and for 2005, Commission Staff Draft Report on the Access Study Initiative, at p.3 Docket 137-FE-100, PSC REF# 44916

21Ex.-SOUL-Powers-23, Direct-SOUL-Powers-24

22Tr. 374-706 (Day 1), at p. 610

23Ex.-SOUL-Powers-13 at p. 23, Figure 24: Energy Utilization by Resource, MISO Renewable Energy 2016. The amount remained at 9% in 2018 according to MISO’s independent monitor, Potomac Economics in their 2018 STATE OF THE MARKET REPORT FOR THE MISO ELECTRICITY MARKETS released this June.

24Ex.-SOUL-Powers-40

25Ex.-SOUL-Powers-22, Ex.-SOUL-Powers-20

26Ex.-SOUL-Powers-39 includes an NTA siting draft for the Town of Vermont and Village of Black Earth where load would be removed from the Wally – Stagecoach 69 kV line

27Ex.-SOUL-Powers-37, Ex.-SOUL-Powers-36 and Ex.-SOUL-Powers-25

28 CHC Project *FEIS at p.100 Table 3-1; CHC Project^^ FEIS at p.103 using CBM and 6.4% Discount Rate; CHC Project ^^^Ex.-PSC-Vedvik at p.3 using 8.4% Discount Rate and the APC method; NTA Evaluated by Applicants -PR* *FEIS at p.100 Table 3-1; Chao NTA*^ *^ Sur-surrebuttal-Applicants-Chao-8 assumes 7.05% Discount Rate; BWARA with Powers Optimized NTA 2 ** pp Ex.-SOUL-Powers-32; Powers NTA 1 Optimized For CHC Budget p Ex.-SOUL-Powers-31; Base With Asset Renewal Alternative (BWARA) - PR** ** Ex.-PSC-Vedvik-3; BWARA CO2 reductions based on increased Iowa to WI transfer capability by 250 MW or 18% of Project capacity of 1388MW.

29Direct-PSC-Vedvik- at pp. 20 to 21

30Tr. 707-1047 (Day 2) p.717

31Tr. 707-1047 (Day 2) p. 743, Tr. 707-1047 (Day 2) p.751

32Tr. 707-1047 (Day 2)750

33Surrebuttal-PSC-Vedvik-5

34Tr. 707-1047 (Day 2) 761

35Tr. 707-1047 (Day 2) p.754

36Direct-MISO-Ellis-1

37707-1047 (Day 2) p.757

38Ex-PSC-Grant-1-34

39TR. 374-706 (Day 1) p. 631

40ex.-CK-Klopp-17-4

41Which would be generally lower under PSC benefit calculations.

42Direct-SOUL-Powers-r2- 20

43Ex.-SOUL-Powers-28 pp.269,270

44Ex-PAD pdf at p. 53 Table 4: Energy Cost Saving Benefits for All Alternatives LVA: $166.1 Project: $164.0 The 1% energy cost savings advantage of the LVA over the Project was changed to a small 5% advantage for the Project after Applicants fixed the “Eden Outlet Constraint.”

45Direct-PSC-Vedvik-36

 



Conference Videos
Harnessing Our Local
Energy Futures

 


March 2, Dodgeville, Forum 

ON WIS VIDEO HUB 

PRINTED PROGRAM - FEATURED ARTICLES
Complete, Live Stream Recording with Discussion



Session I
Meeting Our Priorities with Household and Local Solutions

Session II
Shortfalls in Transmission Review Process and Busting Utility Myths

Session III
Confronting the Harmful Land and Economic Impacts of Transmission Expansion


Evening Speakers

Pat Raimer
Trustee, Village of Montfort, WI 

Keryn Newman
StopPATH WV, Shepherdstown, WV
Participation, Politics, and Public Opinion


Dave Clutter
Driftless Area Land Conservancy, Dodgeville, WI
Protecting the Natural Habitats and Local Economies of the Driftless Area from Unnecessary Transmission Expansion


Bill Powers
Powers Engineering, San Diego, CA
Local-Based Energy Futures and the Obstacle of Transmission Expansion

 


 
 

The grid to nowhere

An argument against building giant transmission lines

BY  

MARCH 1, 2018


 



 


Cartoon by Ken Stark. Used with permission of the artist.


"BWARA" + NTA's 

Select PSC Alternative based on rebuilding existing lines as needed adding Non-Transmission Alternatives to promote system "right-sizing,"

READ BRIEF ONLINE


PRINTABLE PDF VERSION
 
Highlights from Opposition Party Briefs  

Including those of the record number of Citizen Intervenors who made significant contributions during PSC proceeding.
 

Click image to enlarge
 

SHAVE THE

PEAK

Helping electric customers remember to reduce energy use from 2 pm to 6m  on hot, "peak demand" days  and providing Hot weather tips  has been an interest of SOUL for several years. We were recently pleased to learn about similar initiatives such as:
 

Everyone can track collective electricity use in the midwest in real time to see energy and utility interest projections. On the morning of Friday July 19, SOUL sent out an advisory about high expected peak use.  About 1:30 pm we observed an interesting, new phenomenon (click on header image above).  Instead  of energy use rising as utilities plotted in the green lines, about 1pm ,use suddenly leveled off and remained about 6% lower than utilities had predicted. 

To achieve this result likely means some new forces and measures were being deployed.  Whatever they are,  the reduction s a very promising development because nothing adds pressure for new power plants and transmission lines like increasing peak use.  

The Midwest's all time peak use was  eight years 127 GW set on July 20, 2011. Lets keep it that way!  Turn off all non critical uses from 2pm-6pm on hot summer days-particularly when there are several hot days back to back.  



 

ENGINEERING & LEGAL FUND

Please Consider a Tax Exempt Donation to Help Us Renumerate  Bill Powers and Frank Jablonski for their tireless and exceptional services.   

        SOUL of Wisconsin operates entirely on volunteer labor except when we must hire expert witnesses  for cases before the PSC like the Cardinal Hickory Creek (CHC) transmission proposal.  To this end, Non-Transmission Alternative specialist, Bill Powers and Attorney Frank Jablonski have turned in many long days this Spring and Summer.  Transmission builders have not been able to lodge any lasting critique of Bill's NTA testimony for CHC and Frank's 20 year experience with transmission line proposals is largely responsible for the comprehensive findings and suggestions in SOUL's initial brief.  

         If you appreciate what these two gallant gentlemen are doing for Wisconsin and caring electric customers and landowners everywhere, please consider making a tax exempt donation through our a 501(3)C organization to help SOUL show our appreciation. If we can raise $2000 more, it will mean SOUL will not have to invest time on fund raising letters we'd rather spend directly helping lifetime members and communities. Please consider helping out using this link

ENGINEERING FUND

to pay with credit card Paypal, or mail donations to SOUL of Wisconsin, P.O. Box 146, La Farge, WI 54639 . Phone 608.625.4949 for more information.


 

How Energy Efficiency Is Helping States Zero Out Emissions  
 
        In the past year, legislatures in California, Colorado, Maine, Nevada, New Mexico, New York, Puerto Rico, and Washington have all passed bills aimed at making their state’s electricity sector carbon free by 2045-2050. More states have pledged to meet similar goals through executive orders and regulatory frameworks, most recently New Jersey, Minnesota, and Wisconsin.

        In Minnesota, Governor Tim Walz has pushed for a transition to 100% clean electricity while pointing out that utilities are a key partner in this transition. Xcel Energy, which serves more than 1.2 million electric customers and nearly half a million natural gas customers in Minnesota has... committed to closing the last two coal plants it operates in the state and achieving enough energy efficiency to avoid construction of a new power plant.
 

      
 
U.S. Army Corps of Engineers

Upper Mississippi River Master Plan
SCOPING MEETINGS 

 
        
The US Army Corps of Engineers has scheduled public scoping meetings to help the Corps updating the strategic land use and recreation management document that will guide the district’s comprehensive management and development of natural, recreational and cultural resources of the Upper Mississippi River basin for years to come. ....The current plan is in need of revision to address changes to the environment, outdoor recreation trends and the Corps' management policy.

        Pat Popple of Frac Sand Sentinel, has observed, " There seems to be elements of testing public interest and determining areas with lower public priority,   "Areas that show little interest in planning for the future are often better candidates for the dumping of (sometimes toxic) dredged materials. Corps planning also includes who loses land and where their waste goes. Targeted areas experience land seizure through eminent domain.”

Public Scoping Meetings:

Monday, July 22 – 4-7 p.m. – Veterans Conference Room at the County Administration Building, 225 N. Beaumont Rd., Prairie du Chien, Wisconsin

Tuesday, July 23 – 4-7 p.m. – Onalaska Library - Meeting Room B, 741 Oak Ave. S, Onalaska, Wisconsin

Wednesday, July 24 – 4-7 p.m. – Red Wing Public Library, 225 East Ave., Red Wing, Minnesota

Comments Also Accepted Online
 

      
 

Terese's Hot Weather Energy Tips 
 
        ". . . Ceiling and personal fans are excellent for summer because the moving air cools the skin directly. Myth: Fans do not cool the air, walls or furniture, they cool skin. To increase the effect, add a thin layer of moisture with a wash cloth. Personal fans will keep one very comfortable using much, much less energy than running the AC.  Turn a fan off when you leave the room just like you do with the lights.
 

      
 

ENGINEERING & LEGAL FUND

Help Us Renumerate  Bill and Frank for their tireless and exceptional services.   

        SOUL of Wisconsin operates entirely on volunteer labor except when we must hire expert witnesses  for cases before the PSC like the Cardinal Hickory Creek (CHC) transmission proposal.  To this end, Non-Transmission Alternative specialist, Bill Powers and Attorney Frank Jablonski have turned in many long days this Spring and Summer.  Transmission builders have not been able to lodge any lasting critique of Bill's NTA testimony for CHC and Frank's 20 year experience with transmission line proposals is largely responsible for the comprehensive findings and suggestions in SOUL's initial brief.  

         If you appreciate what these two gallant gentlemen are doing for Wisconsin and caring electric customers and landowners everywhere, please consider making a tax exempt donation through our a 501(3)C organization to help SOUL show our appreciation. If we can raise $2000 more, it will mean SOUL will not have to invest time on fund raising letters we'd rather spend directly helping lifetime members and communities. Please consider helping out using this link

ENGINEERING FUND

to pay with credit card Paypal, or mail donations to SOUL of Wisconsin, P.O. Box 146, La Farge, WI 54639 . Phone 608.625.4949 for more information.


 

WISCONSIN RECEIVES A "F" GRADE IN NATIONAL SOLAR RANKING 


Each year, the Energy Democracy Initiative at the Institute for Local Self-Reliance tracks and scores states based on their energy policies and how these policies help or hinder local clean energy action.

      In the 2019 Community Power Scorecard, four states excelled, 11 states and the District of Columbia saw above average scores, 15 were mediocre, and 20 states received failing grades at enabling individuals and communities to take charge of their energy futures. Wisconsin was one of the states whose policies are prohibiting the development of solar with community solar getting especially short changed.

Observes SOUL's Non-Transmission Alternative specialist, Bill Powers, these policies obstruct the development of highly cost effective distributed resources " The $67 million Optimized NTA  for Cardinal Hickory Creek is built around residential and commercial/community net-metered solar, and Energy Efficiency. Two of WI's neighbors get high grades from ILSR on community solar: Illinois "A", Minnesota "B" and Wisconsin gets an "F":  MN is the nation's leader in community solar, at 559 MW online  At the end of 2016, WI had less than 3 MW of community solar online  MN's population is about the same as WI's. WI had just under 50 MW of total solar, of which about 15 MW was residential, at the end of 2017. However, when the WI PSC allows community solar programs, capacity is scooped-up quickly by ratepayers, "In 2015, the Commission approved three community solar programs for NSPW, New Richmond Municipal Utility, and River Falls Municipal Utility. . . NSPW received Commission approval in 2017 to expand its offering to 3 MW and lowered the pricing for all community solar customers. 

Key lacking ingredients in Wisconsin include: p
rovide customer-friendly net energy metering;  provide a standard contract or feed in tariff for distributed renewable resources;  allow shared community renewable energy; ensure simplified interconnection of distributed renewables and allow communities to go further than state buildings energy efficiency codes.  

Entire Report

 
 

New Petition
Stop Utility Abuse of Property Rights in Wisconsin

 
Stronger protections are needed for the thousands of miles of electrical power line [transmission] right-of-ways to reclaim owners rights,and to promote environmental well-being and habitat for plants, animals and healthy local economies.   

By signing the petition, you will be asking the Public Service Commission of Wisconsin to adopt and enforce guidelines, many of which are federally recommended. See Vegetation Management Plan for details.

Lila M. Zastrow, Certified Arborist, International Society of Arboriculture, & Dave Hendrickson
 

Citizen Action of Wisconsin
Energy Cooperative 
Initiative  

 
Focusing on Wisconsin Counties that have been hard hit by floods, storms and climate change, Citizens Action of Wisconsin is promoting a initiative to take advantage of the US Department of Agriculture' A USDA's  Rural Energy Savings Program (RESP) funding with the goal of creating area jobs in energy efficiency and distributed solar generation. Work on homes and business would include upgrades and building improvements, plumbing, insulation, HVAC at low or no cost to residents through "on-bill" financing . RESP programs offer no interest loans to incubate energy projects. 

The initiative is being coordinated by Kevin Kane who has created a video explaining how people can create a cooperative can be sponsored by municipal utilities and cooperatives of which there are many in the affected area .

If you are interested as worker, coop member, organizer or recipient of targeted services. contact Kevin to learn about meetings currently taking place.

Are You Fully Exploiting the Powers of your Household?

Discover clever, low-cost ways to become a 21st Century Load Defector to save money, slash emissions and live with cleaner conscience. 

 If your household electric bill is greater than 700 kilowatt hours, per month, it's likely you can make significant improvements. Learn more about the energy and emission savings tips and email SOUL for your personalized, online tracking sheet to record your monthly progress. See CONTEST  tor households tracking use frm  May 2017 to May 2018. .


 

TRANSMISSION BUILDERS TARGET MORE, HIGH PROFILE Transmission Lines for

NORTHERN WISCONSIN
 

See map on pdf p. 41 of the PSC's  Strategic Energy Assessment and more information here (pdf p.28) Now is the time to protect your community with adoption of resolutions and informing your elected local and state officials. Contact the Energy Planning and Information Committee of the Town of Stark for more information and assistance.
 
 
 

Upper MIchigan
NEW POWER TOURS

 
Melissa Davis, coordinator of the highly successful "New Power Tours" project in Upper Michigan has produced an interactive video about a self-sufficient, distributed generation future for UP local economies. New Power Tours is continuing to provide a novel home improvement project with a mission is to increase the use of renewable, water and energy-efficient technologies through volunteer-based thermal upgrades of homes of income-qualified residents. She also coordinates events with visiting experts  to help communities define and develop energy planning goal and projects. For more information contact Melissa as this address.  

 
LIFETIME MEMBERSHIP to support ratepayer energy investment priorities is only $5!  Membership numbers are especially important when SOUL intervenes in utility cases and seeks funding for engineers and other experts.  Consider two or more memberships for your family. Donations above the $5 fee are tax deductible. Join online here or mail a check to SOUL of Wisconsin, PO Box 146, La Farge, WI 54639 

 
click to enlarge

Vernon County Farmers Union Potluck
JULY 27
Chaseburg, WI

Join the Vernon County Farmers Union Chapter for a Potluck Picnic! Crawford Stewardship Project was honored to be with many others in creating the newly formed Iowa-Grant County Wisconsin Farmers Union Chapter. While we are excited to be involved with this new chapter moving forward we are also working to catalyze Crawford County residents to be active in the Wisconsin Farmers Union.  

Moving forward we will be working with the Vernon County Chapter to find the best way to restructure and include Crawford County residents as part of the Vernon Chapter. If you live in Crawford County and are a member or want to become a member, come enjoy the picnic on the 27th. And Stay tuned for future news and exciting opportunities!
 

MORE CRAWFORD STEWARDSHIP EVENTS 


 
20th Century Utility Assumptions Failing Ratepayers in 21st Century

Article by  David Roberts explaining causes for skyrocketing cost increases and unwitting liabilities utilities are bringing upon electric customers as they refuse to embrace cost-effective solutions. Companion article  by Roberts' provides an overview of New York State's Reforming the Energy Vision (REV) program in which the NY PSC ordered utilities to apply $200,000 towards energy efficiency, local power and load management instead of spending $1 billion upgrading an older substation. See also Sept 2016 progress report on the initiative.

 
Six ways we have slashed US energy use by a fifth

      Major energy efficiency policies slashed US energy use by about 20% in 2017, saving a whopping 25 quads of energy —the amount used in California, Texas, and Florida combined.

      Two US policies now at risk accounted for the majority of these savings. Vehicle fuel economy standards and appliance efficiency standards saved 14.3 quadrillion Btus, about 60% of the total savings and about 14% of all US energy use. Unfortunately, the Trump administration is proposing to roll them back (see here and here).

      Savings from six key efficiency policies increased more than 15% since 2014, when we last compiled our estimates. Savings in 2017 (listed in the table below) give a sense of the scale of efficiency’s impacts. Note that the estimate for each policy uses a different methodology, so the savings may not be fully comparable.

      The figures total 26 quads, but I round down to 25 quads to allow for some overlap in savings estimates. These estimates, though, do not include savings from many other, mostly smaller, energy efficiency policies.
Here are six major policies that have dramatically reduced US energy use and the accompanying carbon dioxide emissions.
 

click to enlarge

Vehicle standards
Fuel economy standards for cars, minivans, and SUVs, which first took effect in 1978 under legislation passed by President Gerald Ford, generated the largest energy savings in 2017. They saved an estimated 9.0 quads, according to figures by the US Department of Transportation. We add savings of 0.3 quads (ACEEE calculations) from heavy-duty vehicle standards that were enacted under President George W. Bush in 2005. New savings from vehicle standards are expected to grow substantially through 2020 as a result of revisions established by the Obama administration. Further progress on passenger vehicles will depend on whether the Trump administration follows through on a proposal to freeze standards at 2020 levels, and if it does, whether the courts sustain such a freeze.

Appliance and equipment standards
The second-largest savings, 6.0 quads, come from minimum efficiency standards on appliances and other types of energy-using equipment. These estimates come from a 2017 report with updates by the Appliance Standards Awareness Project, which is based at ACEEE. Congress has enacted standards on more than 50 products, beginning with legislation signed by President Ronald Reagan. The US Department of Energy (DOE) periodically revises these standards. Unfortunately progress has stalled the past few years as rulemakings have slowed to a crawl and, in the case of light bulb standards, the Trump administration has proposed a rollback.

ENERGY STAR®
Third on the list is the ENERGY STAR program, including ENERGY STAR homes, buildings, and equipment. ENERGY STAR has operated for more than 20 years, steadily expanding its market reach and participation levels. The US Environmental Protection Agency (EPA) estimates that this program saved about 370 billion kilowatt-hours (kWh) of electricity in 2017, which is equivalent to 3.7 quads. EPA estimates an additional 0.5 quads of savings in direct fossil fuel use in homes, buildings, and industry, for a total of 4.2 quads of savings.

Utility sector energy efficiency programs
Fourth is energy efficiency programs funded by utility customers and operated by either the utilities themselves or other entities designated by states and utilities. These programs help utility customers save energy and reduce their bills. They also help the utility and all ratepayers, because saving a kWh is generally less expensive than generating a kWh. These programs, begun in the late 1970s in a few states, have expanded over the years and are now offered by utilities in most states. In 2017, these programs saved about 242 billion kWh and 400 trillion Btus of natural gas for a total of 2.7 quads. The electricity data come from ACEEE’s State Energy Efficiency Scorecard. The gas data come from our 2017 report on natural gas efficiency and also include more recent data from our State Scorecard.

Federal RD&D
Federal government energy efficiency research, development, and deployment (RD&D) appears to produce a similar level of savings as utility programs, but this estimate is very uncertain. Our figure is based on 2017 estimated savings from a 2001study, which in turn is based on work by the National Academy of Sciences and the President’s Council of Advisors on Science and Technology. DOE has a substantial energy efficiency RD&D effort that has contributed to such energy-saving products as LED lighting, industrial process innovation, heavy-duty vehicle fuel economy improvements, electronic ballasts for fluorescent lamps, windows with special heat-reflective coatings, and advanced building analytic software. DOE has conducted more recent evaluations on specific RD&D projects but has not estimated the overall savings and other benefits from its RD&D program.

Building codes
Building energy codes are next on the list, saving an estimated 1.5 quads in 2017. The first energy codes were developed in the 1970s, and code stringency has steadily increased since then, driven by new technologies and practices, as well consumer economics. Compared to 1980 codes, current national model building codes reduce energy use by nearly 40% (residential) to 50% (commercial). Most states adopt one of these model codes as a statewide code, and some cities also adopt codes. Our energy savings estimate comes from our 2014 analysis, with the addition of savings for 2015–2017 from the same sources. This estimate is highly approximate.

Caveats
These estimates, which are approximate, come from a variety of sources and employ different methodologies. Some, such as for RD&D and building codes, are highly approximate. Also, some savings estimates overlap, such as ENERGY STAR and utility sector programs. We crudely adjusted for this overlap by rounding down the total, but please note that this adjustment is inexact
 
Copyright © 2019 Wisconsin Energy Awareness Initiative, All rights reserved.


Want to change how you receive these emails?